InstaKool Boosts Power Output for SRI

The site in question is an oil refinery in Italy, which was using its GE Frame 6 gas turbine to generate power. The operator was experiencing a power loss for approximately 8 months of the year due to higher summer temperatures and discussed potential cooling solutions with AAF.

 

Transforming efficiency and power output

InstaKool was recommended as it is a reliable and a low risk cooling solution due to the intelligent control system that manages the flow of water to the rotary atomisers upstream of the filters. This allows temperature, relative humidity and differential pressure to be controlled and monitored to ensure optimal operation, maximum air cooling and stable differential pressure.